BACK

INSTALLATION OF  A NEW FIRE WATER SYSTEM IN LULEÅ OIL HARBOUR (2004)

Luleå Industrimontage AB is as main contractor to install a new fire water system in the Oil harbour.

The assignment contains of build-, steel-, pipes-, and electricity works.

The project is due during spring 2004 and finished in September.

The erection comprise 1500 metres epoxy pipes in 300 mm dimension and employs 10 men.

BACK