STEEL ASSEMBLY DURING COOLING SYSTEM CHANGE AT LKAB, SVAPPAVAARA (2002)

LKAB executed a change of the cooling system at the pelletizing plant in Svappavaara. We demolished the existing supporting beam structure for the channel to and from the exhaust-furnace and built a new one. We also constructed the catwalks and the service level.

The project employed 15 men at the most and lasted for five months. It required around 100 tons of steel.

 