ASSEMBLY OF CONCRETE, ACUSTICUM PITEÅ (2002)
Assembling of concrete framework for Acusticum at the University of Music in Piteå. First we assembled the concrete framework, around 1100 tons. Then we lifted the 70 meter high tower which was preassembled at ground level out of five parts, 20 to 55 tons each.
|
|
|
![]() |
![]() |
| Construction of the concrete frame work (Click to enlarge picture) | Parts of the tower ready for erection (Click to enlarge picture) |
![]() |
![]() |
|
|
|
|
Parts of tower on its way up (Click to enlarge picture) |
Last piece in place (Click to enlarge picture) |